Ad for Bids Publish June 8, 10, 2022 Bra - Alexandria Echo Press | News, weather and sports from Alexandria, Minnesota

2022-06-25 00:32:09 By : Ms. June Qian

Ad for Bids Publish June 8, 10, 2022 Brandon-Evansville Additions and Renovations Bid Package 2 – Structural Steel (Re-Bid) LOCATION OF WORK: Evansville School Campus 123 Second Ave W Evansville, MN 56326 PROJECT DESCRIPTION: The project consists of multiple work scopes for all the work necessary for the construction of an Addition, Interior Renovations, and Sitework Improvements at each campus. This Bid Package, Bid Package 2, is a material (Work Scope #3) & labor package (Work Scope #4), consisting of Structural steel framing, steel joist framing, steel decking and misc. metal fabrications. Bid Package 3, with the remainder of the work scopes, will be released later in the fall of 2022. BID DATE AND LOCATION: Sealed Bids will be received at Evansville Public School, 123 2nd Ave W, Evansville, MN 56326 then publicly opened and read aloud. Bids will be received and stamped-in prior to 3:30 PM local time on June 21, 2022. Bids submitted after allotted time will be discarded, NO EXCEPTIONS. PRE-BID CONFERENCE: A Pre-Bid conference will be held at 4:30 PM on June 9 at Evansville Public School; 123 2nd Ave W, Evansville, MN 56326 (Senior Center; West side of building). A site review will take place immediately following the Pre-Bid conference. No extras will be allowed because of the Bidder’s misinterpretation as to the amount of work involved, Bidder’s own error, negligence, or failure to examine the site. START DATE: Work will begin after receipt of the signed contract from the Owner. The anticipated award date is as soon as possible following bid opening. Pre-construction and submittals work related to the project is to commence immediately after receipt of the signed contract. The onsite work will begin on the premises no later than April or May 2023 to start the Additions as soon as weather allows. SUBSTANTIAL AND COMPLETION DATE: Owner requires all Structural Steel work at Evansville Addition to be substantially completed by July 28, 2023. Refer to milestone schedule in bid documents. 70296